Ahmad, H S, Ayoush, M D and Al-Alwan, M S (2019) Causes of delay to public infrastructure projects according to engineers representing different contract parties. Built Environment Project and Asset Management, 10(01), 153–79.

Aibinu, A A, Carter, S, Francis, V and Vaz-Serra, P (2019) Request for information frequency and their turnaround time in construction projects. Built Environment Project and Asset Management, 10(01), 1–15.

Ershadi, M J, Edrisabadi, R and Shakouri, A (2019) Strategic alignment of project management with health, safety and environmental management. Built Environment Project and Asset Management, 10(01), 78–93.

  • Type: Journal Article
  • Keywords: Occupational health; Environmental management; Project management; Structural equation modelling; Safety measures;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-03-2019-0023
  • Abstract:
    Project management generally covers many important areas such as cost, quality and time in different industrial settings, but it is deficient in relation to integration of health, safety and environmental risks. Poor knowledge of project managers about HSE management necessitates the studying on the mutual effects of HSE and project management. Hence, investigating the impact of project management on health monitoring programs, safety prevention monitoring, environmental monitoring plans and finally the effectiveness of professional health monitoring programs and determining their importance are main objectives of this research. The paper aims to discuss these issues. Design/methodology/approach A model based on structural equations was designed and developed. The constructs of this model are project management, health monitoring and safety prevention monitoring program. Based on the conceptual model, some questionnaires were prepared and distributed among the experts of strategic project management. Findings The results of applied structural modeling suggest that project management focuses on each aspect of HSE management, including health monitoring programs, safety prevention monitoring programs, environmental monitoring plans and effectiveness of professional health monitoring programs. HSE management can also be strengthened by empowering project management. Checking fire protection systems, using appropriate techniques to identify contamination and disposal of waste and incorporating techniques for brainstorming or other ideas creation in the group are the most important tasks in HSE-enabled project management frameworks. Originality/value Since there is still no strategic alignment model that includes components of project management and HSE management, a model for achieving this goal is vital. This paper elaborates this alignment based on literature and using a field study.

Eyiah-Botwe, E, Aigbavboa, C O and Thwala, W D (2019) Curbing PPP construction projects’ failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(01), 50–63.

Jalali, A, Hidzir, N I, Jaafar, M and Dahalan, N (2019) Factors that trigger bullying amongst subcontractors toward intention to quit in the construction projects. Built Environment Project and Asset Management, 10(01), 140–52.

Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2019) Investment apportionments among participants of PPP rental retirement villages. Built Environment Project and Asset Management, 10(01), 64–77.

Owolabi, H, Oyedele, L, Alaka, H, Ajayi, S, Bilal, M and Akinade, O (2019) Risk mitigation in PFI/PPP project finance. Built Environment Project and Asset Management, 10(01), 28–49.

Rethnam, O R, Palaniappan, S and Ashokkumar, V (2019) Life cycle cost analysis of 1MW power generation using roof-top solar PV panels. Built Environment Project and Asset Management, 10(01), 124–39.

Sayed, A M, Assaf, S, Aldosary, A S, Hassanain, M A and Abdallah, A (2019) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(01), 16–27.

Tennakoon, G, Waidyasekara, A and Ekanayake, B (2019) Revisiting the role of professionals in designing buildings with low embodied and operational energy. Built Environment Project and Asset Management, 10(01), 110–23.

Ugulu, R A, Arewa, A and Allen, S (2019) Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry. Built Environment Project and Asset Management, 10(01), 94–109.